Tigris K1 press fit
Tigris K1 is a multilayer pipe system designed for potable water and heating applications. It is ideally suited for installation on commercial projects such as educational establishments, apartment blocks and hotels.
The system comprises multilayer composite pipe and high quality polyphenyl sulphone (PPSU) fittings with a fixed stainless steel sleeve, in sizes 16mm, 20mm, 25mm, 32mm, 40mm, 50mm, 63mm and 75mm.

ETIM CLASS
NOMINAL INNER DIAMETER
OUTER PIPE DIAMETER
OUTER PIPE DIAMETER CONNECTION 1
OUTER PIPE DIAMETER CONNECTION 2
EXTERNAL TUBE DIAMETER OF CONNECTION 3
LENGTH
WORKING LENGTH CONNECTION 1
WORKING LENGTH CONNECTION 2
LENGTH OF CONNECTION 1
LENGTH OF CONNECTION 2
CONNECTION 1
CONNECTION 2
ANGLE OF BOW
MATERIAL
COLOUR
MODEL
SHAPE
MAIN MATERIAL
WALL THICKNESS
SUITABLE FOR PIPE DIAMETER
NOMINAL INNER DIAMETER CONNECTION 1
SURFACE PROTECTION
RING STIFFNESS CLASS
WRENCH WIDTH
STANDARD DIMENSION RATIO (SDR)
SUITABLE FOR PIPE DIAMETER
OPERATION
Downloads
Browse and download all our documents View all downloads
System Information
You need to enable cookies to see this content.
Enable cookiesYou need to enable cookies to see this content.
Enable cookiesYou need to enable cookies to see this content.
Enable cookies-
Major refurbishment of Brussels’ fifth largest building, the Astro Tower, is now complete
The Astro Tower is the fifth largest building in Brussels. At 107 meters high, it has 34 floors and 35,000 m² of office space. The tower underwent a complete transformation and was given a new façade in blue reflective glass. Even the interior was gutted. All the pipes for hot & cold water supply and drainage were all replaced with select prod...
-
Wavin Tigris K1 passes fast-track school build test
The Esker Education Together National School in Dublin was financed and constructed as part of the Department of Education and Skills’ Rapid Build Programme. The two-storey build consisted of 16 classrooms, six support teaching classrooms, a hall, library, staff room, two ball courts, a play area and associated ancillary accommodation. Constru...
-
A carefully considered solution for Cedar Care Homes
Cedar Care Homes, a national provider of elderly care and accommodation, has recently started the construction of a new 83 bed care home in Bristol. This new build development needed a reliable, cost effective pipe system that met the requirements of both the project and its future residents.
-
K1 solves plumbing issues at County Down monastery
The Tigris K1 Multilayer Press-fit plumbing system for potable, sanitary and heating applications has been installed throughout the site of a Monastery situated in the heart of Crossgar, County Down. Tigris K1, Wavin’s approach to above ground drainage and plumbing for industrial, public, commercial and multi-occupancy buildings, now forms the...
-
Underfloor heating in family home gives a very warm welcome
Hep₂O underfloor heating keeps the Douglas’s family cosy and warm with the installation of their beautiful 25m² orangery extension. It goes without saying that one of the most fundamental requirements of any building is to keep occupants warm and comfortable, regardless of the weather outside and the nature of the property. One of the fastest ...