Tree root growth
Wavin Insights: Sewer blockages caused by tree root growth.
Read morePrefabricated construction – whether an entire building, home or plumbing pipe system – is beginning to increase in popularity and use. Modularity, speed of installation, cost-savings, and sustainability are just some of the key benefits that are attracting customers and developers to prefab solutions. So when Unica, installer on the new Amphia Hospital project at the Molengracht site in Breda (The Netherlands), needed a soil & waste drainage pipe solution, they decided to go with a prefab pipe system.... from Wavin.
The Astro Tower is the fifth largest building in Brussels. At 107 meters high, it has 34 floors and 35,000 m² of office space. The tower underwent a complete transformation and was given a new façade in blue reflective glass. Even the interior was gutted. All the pipes for hot & cold water supply and drainage were all replaced with select products from Wavin’s range of piping solutions.